Lesson flow design-skill comparison
The lesson data and interaction contract stay fixed. Use the controls to compare the frozen pre-promotion baseline against two independently produced visual revisions.
Method: the historical control is frozen in dedicated baseline wrappers. One revision uses only redesign-existing-projects; the other uses the official Impeccable workflow beginning with init and critique.
Lesson
Experiment
Arrangement
Viewport
Hold constant: instructional copy, fixtures, stage order, code and memory states, answer checking, navigation, and viewport. Compare hierarchy, legibility, focus, interaction feedback, density, and the relationship between source code and program state.
Method records: redesign-skill audit and rationale ยท Impeccable critique and command sequence